THE Zambezi River Authority (ZRA) has slashed water allocations for power generation at Kariba Dam to 23 billion cubic metres (BCM) in 2027, warning of a potentially dry season due to El Niño conditions. The allocation, which will be shared equally between Zambia’s ZESCO Limited and Zimbabwe Power Company (ZPC), gives each utility 11.5 BCM, […] The post Kariba power water allocation slashed to 23 billion cubic metres for 2027 appeared first on NewZimbabwe.com.

Originally published by The Zimbabwe News. Read original article